H2Hub by ReneEnergy

Test a hydrogen project before you commit to it

H2Hub is ReneEnergy's hydrogen project modeling and learning platform. It turns an idea into a documented pre-feasibility scenario: site, resource, an 8,760-hour operating year, economics and stress tests, with every input visible.

Your first full project and its PDF report are free per account. No credit card.

The workflow

What H2Hub does, step by step

01 · Screening

Project screening and early assumptions

Define the site, product, scale and offtake, and record the starting assumptions so they can be challenged later.

02 · Resource

Site-specific renewable resource

Use location-specific solar and wind data instead of a generic capacity factor.

03 · Operations

8,760-hour operations modeling

Model every hour of a year: power availability, electrolyzer dispatch, storage and utilisation.

04 · Economics

Hydrogen production and economics

Annual output, levelised cost of hydrogen and the cost drivers behind it, with each input labelled by source.

05 · Stress tests

Stress testing and scenario comparison

Change electricity price, equipment size, utilisation and other inputs, and compare scenarios side by side.

06 · Reports

Project reports and next-step decisions

A documented PDF report and a clear view of what needs formal engineering or diligence next.

Know which result you are looking at

Quick screening estimates vs the full project workflow

H2Hub has both. They answer different questions and should not be confused.

Comparison of screening estimates and the full project workflow
Screening estimateFull project workflow
PurposeA first sense of scale and costA documented pre-feasibility scenario for one project
InputsA few headline assumptionsSite, resource data, equipment, operating strategy, costs and financing assumptions
OperationsSimplified annual averages8,760-hour operating year
Stress testsNot includedScenarios and sensitivities
OutputIndicative figures IllustrativePDF report with stated inputs and limitations Preliminary
What H2Hub is not

H2Hub produces preliminary hydrogen project-development analysis with transparent inputs, assumptions and documented results. It is not a substitute for licensed engineering, FEED, permitting, legal advice or formal financial due diligence, and it does not certify equipment or verify plant output.

Learning and intelligence

Learn the engineering and the economics

H2Hub includes courses, previews and public intelligence pages on hydrogen technology, projects and companies. Two courses are free.

Explore H2Hub learning

Plans

Start free, upgrade only if you need more

  • First full project and PDF report: free, no credit card
  • Paid plans for saved projects, more model runs and comparisons
  • Teams: custom pricing for organisations

Prices and plan limits are maintained on H2Hub so they are always current.

Model your first project free

Run one full project through the workflow and download its report. For multi-user access or vendor-specific assumptions, talk to us about Teams.