Engineering-led media and analysis for hydrogen

Understand the technology and test the economics — before you commit.

ReneEnergy explains how hydrogen and clean-energy systems actually work, and gives you the tools to check whether a project holds up. Independent films on Renewables2050, project screening in H2Hub, and technical media for the companies building the industry.

Your first H2Hub project and PDF report are free. No credit card.

Worked example · H2Hub

100 MW PEM · 200 MW wind

Plant-gate cost

$5.60/kg

Result

Target price

$4.50/kg

Input
Electrolyser utilisation
53.7%
Gap to close
$1.10/kg
Power price needed
~$36/MWh, not $55

Next step

Can a power agreement or vendor-confirmed operating limits get there? If not, pause before feasibility.

Modelled demonstration from one representative weather year. An illustration, not a prediction for your project.

Why it matters

Hydrogen decisions go wrong on the details nobody explained.

Brochures show peak performance, headlines show announcements, and spreadsheets hide their assumptions. We work on the three places where understanding usually breaks down.

01

The technology

How a stack, a balance of plant or a fuel-cell system actually works, and what it takes to operate it.

02

The economics

Power price, utilisation and scale decide most hydrogen projects. We make those numbers visible and testable.

03

The explanation

Buyers, investors and partners need the same facts, told clearly. We turn evidence into films people understand.

Who it’s for

One evidence base. Three ways to use it.

Project developers & analysts

Screen a site, test the economics and see which assumption to fix first, in H2Hub.

Screen a project

For technology companies

Electrolyzer, fuel-cell & equipment makers

Show customers how your system works with an original, evidence-based film you own and publish.

See film packages

Consultancies, vendors & educators

H2Hub for teams and vendors, or a technical communication programme for events and launches.

Explore partnerships

How we work

From a question to a clear answer in six steps.

The same method sits behind every film, article and H2Hub result.

  1. Define

    Agree the question, the audience and the evidence that would answer it.

  2. Research

    Specifications, literature, company disclosures and resource data.

  3. Model or script

    Run the numbers in H2Hub, or build the story around the engineering.

  4. Label

    Every figure tagged by type, with its source or calculation.

  5. Review

    A factual check before anything is published or delivered.

  6. Deliver

    A film, a report or a model, with the source record attached.

See it in practice

Recent films from Renewables2050

Independent editorial films, researched, scripted, animated and narrated in-house. None was commissioned by the companies it covers.

Industrial energy systems ·

How Hydrogen Gas Turbines Work: Burning Hydrogen for Power

Industrial energy systems ·

How Grey Hydrogen Is Made, and Where the Carbon Goes

Electrolyzer technologies ·

How Much Does Seawater Add to Hydrogen Cost?

Why trust it

An assumption never quietly becomes a fact.

Every figure we publish is labelled as a company disclosure, an expectation, our own calculation, an illustration, or not publicly disclosed.

Editorial work on Renewables2050 stays independent. Partners cannot buy a conclusion or a model result.

How we work
Type of figureLabel · what we show
  • Manufacturer efficiency claimDisclosure cited in the source record
  • Planned commissioning dateExpected shown as not yet proven
  • Hydrogen cost per kgCalculation model and inputs shown
  • Cutaway animation of a stackIllustrative not field performance
  • Undisclosed contract valueNot disclosed stated as unknown

We’ll show you what the brochure leaves out.

Most hydrogen claims break on power price, utilisation, scale or a missing source. Seeing that early, with the evidence written down, beats finding out after the money is committed.

Ways to work with us

Free to start. Priced for professional work.

H2Hub

$0

One full hydrogen project through H2Hub, plus its PDF report. No card.

Start free

Technical Explainer

from$2,500

A 2–4 minute animated explainer, a vertical Short and a source record.

Request a proposal

Full Engineering Film

Recommended

from$5,000

An 8–10 minute film, three Shorts, captions and source documentation.

Request a proposal

Teams & partnerships

Scoped in writing

H2Hub for teams and vendors, documentaries and multi-asset programmes.

Talk to us

H2Hub paid plans start at $79/month (Professional) after the free project. The Signature Technical Story documentary starts at $8,500. All film packages

Bring one question. Start with what you know.

A technology, a project location or a product launch is enough to begin.