Engineering-led media and analysis for hydrogen
Understand the technology and test the economics — before you commit.
ReneEnergy explains how hydrogen and clean-energy systems actually work, and gives you the tools to check whether a project holds up. Independent films on Renewables2050, project screening in H2Hub, and technical media for the companies building the industry.
Your first H2Hub project and PDF report are free. No credit card.
Worked example · H2Hub
100 MW PEM · 200 MW windPlant-gate cost
$5.60/kg
ResultTarget price
$4.50/kg
Input- Electrolyser utilisation
- 53.7%
- Gap to close
- $1.10/kg
- Power price needed
- ~$36/MWh, not $55
Modelled demonstration from one representative weather year. An illustration, not a prediction for your project.
Why it matters
Hydrogen decisions go wrong on the details nobody explained.
Brochures show peak performance, headlines show announcements, and spreadsheets hide their assumptions. We work on the three places where understanding usually breaks down.
01
The technology
How a stack, a balance of plant or a fuel-cell system actually works, and what it takes to operate it.
02
The economics
Power price, utilisation and scale decide most hydrogen projects. We make those numbers visible and testable.
03
The explanation
Buyers, investors and partners need the same facts, told clearly. We turn evidence into films people understand.
Who it’s for
One evidence base. Three ways to use it.
Project developers & analysts
Screen a site, test the economics and see which assumption to fix first, in H2Hub.
Screen a projectFor technology companies
Electrolyzer, fuel-cell & equipment makers
Show customers how your system works with an original, evidence-based film you own and publish.
See film packagesConsultancies, vendors & educators
H2Hub for teams and vendors, or a technical communication programme for events and launches.
Explore partnershipsHow we work
From a question to a clear answer in six steps.
The same method sits behind every film, article and H2Hub result.
Define
Agree the question, the audience and the evidence that would answer it.
Research
Specifications, literature, company disclosures and resource data.
Model or script
Run the numbers in H2Hub, or build the story around the engineering.
Label
Every figure tagged by type, with its source or calculation.
Review
A factual check before anything is published or delivered.
Deliver
A film, a report or a model, with the source record attached.
See it in practice
Recent films from Renewables2050
Independent editorial films, researched, scripted, animated and narrated in-house. None was commissioned by the companies it covers.
How Grey Hydrogen Is Made, and Where the Carbon Goes
How Much Does Seawater Add to Hydrogen Cost?
Why trust it
An assumption never quietly becomes a fact.
Every figure we publish is labelled as a company disclosure, an expectation, our own calculation, an illustration, or not publicly disclosed.
Editorial work on Renewables2050 stays independent. Partners cannot buy a conclusion or a model result.
How we work- Manufacturer efficiency claimDisclosure cited in the source record
- Planned commissioning dateExpected shown as not yet proven
- Hydrogen cost per kgCalculation model and inputs shown
- Cutaway animation of a stackIllustrative not field performance
- Undisclosed contract valueNot disclosed stated as unknown
We’ll show you what the brochure leaves out.
Most hydrogen claims break on power price, utilisation, scale or a missing source. Seeing that early, with the evidence written down, beats finding out after the money is committed.
Ways to work with us
Free to start. Priced for professional work.
Technical Explainer
from$2,500
A 2–4 minute animated explainer, a vertical Short and a source record.
Request a proposalFull Engineering Film
Recommendedfrom$5,000
An 8–10 minute film, three Shorts, captions and source documentation.
Request a proposalTeams & partnerships
Scoped in writing
H2Hub for teams and vendors, documentaries and multi-asset programmes.
Talk to usH2Hub paid plans start at $79/month (Professional) after the free project. The Signature Technical Story documentary starts at $8,500. All film packages
Bring one question. Start with what you know.
A technology, a project location or a product launch is enough to begin.